What must be done before building on a landfill?

  1. Notify the local community

  2. Notify the government and engineers

  3. Conduct a soil analysis

  4. Obtain a construction permit

The correct answer is: Notify the government and engineers

Before building on a landfill, notifying the government and engineers is a critical step because this involves compliance with regulations and safety requirements. Landfills can present unique challenges and risks due to the materials buried within them and the potential for subsidence or chemical leaching. Government agencies typically need to assess the proposed construction to ensure it adheres to safety standards and environmental regulations. Engineers also play a vital role as they can provide the necessary assessments and designs to address the specific hazards associated with building on a landfill site. They are responsible for evaluating the stability of the ground and recommending appropriate construction techniques and materials that can mitigate potential risks. Though conducting a soil analysis is an important practice, it is often part of the broader process that includes obtaining necessary permits and notifying the relevant authorities. Such analyses help in understanding the soil composition and safety, but it should follow the initial notification to ensure that all parties involved are informed and can respond accordingly. Similarly, obtaining a construction permit is a requirement but typically comes after the necessary assessments and notifications have been completed. Informing the local community is also relevant, yet it is secondary to ensuring that official channels, such as government notifications and engineering assessments, are adequately addressed.